The Royal London and Barts Hospitals
The twenty-five storeys of floor space at these prestigious London hospitals require a lot of services. We were commissioned to provide support platforms within the riser ducts to carry the service pipes and to allow safe access for maintenance. Fabrication drawings were prepared in sequence with the pouring of concrete floor slabs to enable our client to fabricate the steelwork, transport it to site and install it with no delay to the main contractor. Our team provided constant support, efficiently dealing with minor modifications resulting from late changes.
Client: Southern Erectors
|